CCNP Switch 642-813 Exam Objectives / Topics

Started by certforumz, July 05, 2013, 05:34:45 AM

Previous topic - Next topic

certforumz

CCNP Switch 642-813 Exam Topics

The following information provides general guidelines for the content likely to be included on the exam. However, other related topics may also appear on any specific delivery of the exam. In order to better reflect the contents of the exam and for clarity purposes the guidelines below may change at any time without notice.

Implement VLAN based solution, given a network design and a set of requirements

  • Determine network resources needed for implementing a VLAN based solution on a network
  • Create a VLAN based implementation plan
  • Create a VLAN based verification plan
  • Configure switch-to-switch connectivity for the VLAN based solution
  • Configure loop prevention for the VLAN based solution
  • Configure Access Ports for the VLAN based solution
  • Verify the VLAN based solution was implemented properly using show and debug commands
  • Document the verification after implementing a VLAN solution

Implement a Security Extension of a Layer 2 solution, given a network design and a set of requirements

  • Determine network resources needed for implementing a Security solution
  • Create a implementation plan for the Security solution
  • Create a verification plan for the Security solution
  • Configure port security features
  • Configure general switch security features
  • Configure private VLANs
  • Configure VACL and PACL
  • Verify the Security based solution was implemented properly using show and debug commands
  • Document the verification results after implementing a Security solution

Implement Switch based Layer 3 services, given a network design and a set of requirements

  • Determine network resources needed for implementing a Switch based Layer 3 solution
  • Create an implementation plan for the Switch based Layer 3 solution
  • Create a verification plan for the Switch based Layer 3 solution
  • Configure routing interfaces
  • Configure Layer 3 Security
  • Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
  • Document the verification results after implementing a Switch based Layer 3 solution

Prepare infrastructure to support advanced services

  • Implement a Wireless Extension of a Layer 2 solution
  • Implement a VoIP support solution
  • Implement video support solution

Implement High Availability, given a network design and a set of requirements

  • Determine network resources needed for implementing High Availability on a network
  • Create a High Availability implementation plan
  • Create a High Availability verification plan
  • Implement first hop redundancy protocols
  • Implement switch supervisor redundancy
  • Verify High Availability solution was implemented properly using show and debug commands
  • Document results of High Availability implementation and verification

GeorgeKica

I AM PREPARING FOR MY CCNP EXAM WHICH I AM PLANNING TO WRITE ON APRIL END
I WOULD LIKE TO KNOW ABOUT THE FOLL THINGS

1    SO I WOULD LIKE TO KNOW WHICH IS THE EASIEST PAPER AMONG THE 3 PAPERS -> ROUTE, SWITCH, and TSHOOT.

2    WHAT IS THE COST FOR 1 PAPER IN INDIAN RUPEES?

3    VALIDITY FOR EACH PAPER?


4    WHICH PAPER IS BETTER FOR GETTING A JOB?

5    WHERE TO GET THE DUMPS FOR EACH PAPER.